OIL CONTROL VALVE (OCV) INSPECTION [SKYACTIV-G 2.5T]


id0110q8801400


Coil Resistance Inspection

1.  Disconnect the negative battery terminal. (See NEGATIVE BATTERY TERMINAL DISCONNECTION/CONNECTION.)

2.  Remove the plug hole plate. (See PLUG HOLE PLATE REMOVAL/INSTALLATION [SKYACTIV-G 2.5T].)

3.  Disconnect the OCV connector.

4.  Measure the resistance between terminals A and B using an ohmmeter.

am6xuw00006266
OCV coil resistance
6.9—7.55 ohms [20°C {68°F}]
•  If not as specified, replace the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [SKYACTIV-G 2.5T].)

5.  Install in the reverse order of removal.


Spool Valve Operation Inspection

1.  Disconnect the negative battery terminal. (See NEGATIVE BATTERY TERMINAL DISCONNECTION/CONNECTION.)

2.  Remove the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [SKYACTIV-G 2.5T].)

3.  Verify that the spool valve in the OCV is in the maximum valve timing advance position as indicated in the figure.

ac5wzw00003200
•  If not as specified, replace the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [SKYACTIV-G 2.5T].)

4.  Verify that the battery is fully charged. (See BATTERY INSPECTION.)

•  If not as specified, recharge the battery. (See BATTERY RECHARGING.)

Note
•  When applying battery positive voltage between the OCV terminals, the connection can be either of the following:
?  Positive battery cable to terminal A, negative battery cable to terminal B
?  Positive battery cable to terminal B, negative battery cable to terminal A
am6xuw00006266

5.  Apply battery positive voltage between the OCV terminals and verify that the spool valve operates and moves to the maximum valve timing retard position.

ac5wzw00003201
•  If not as specified, replace the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [SKYACTIV-G 2.5T].)

6.  Stop applying battery positive voltage and verify that the spool valve returns to the maximum valve timing advance position.

•  If not as specified, replace the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [SKYACTIV-G 2.5T].)

7.  Install the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [SKYACTIV-G 2.5T].)